Pool Startup Process After Plaster Resurfacing


the pool repair guy logo

PoolStartupProcessAfter PlasterResurfacing

 

ImportantWarnings(fromNPCGuidelines):
  • Donotaddsaltfor salt-watersystems for30

  • Noswimming,pets,orheateruseuntilplasterdustis goneandwater isbalanced (typically after Day 7).
  • Brushthepooleveryvisitonwallsandfloortoremoveplasterdust—use anylonbrush, starting from the tile line down.
  • Tostartrunfiltrationcontinuouslyforatleastthefirst 72hours oruntilwateris
  • Testwaterdaily(pH,totalalkalinity/TA,calciumhardness/CH,chlorine)usingareliable
  • Alwayspre-dilutemuriaticacid(31-33%hydrochloricacid)inabucketofpoolwater before adding slowly to the deep end with circulation running. Wear protective gear.
  • AddTheMagentaStuffpermanufacturerdosage(e.g.,1quartper15,000gallonson startup for plaster pools) to sequester metals and prevent stains.
  • Targetranges:pH7.2-7.6,TA80-100ppm,CH200-400ppm(buildgradually),Chlorine 1.5-3.0 ppm (after Day 2), Cyanuric Acid (CYA) 30-50 ppm (start after Day 3).
  • Recordalltestsandadjustmentsfor

Pre-Startup:PoolFilling(Day0)

 

  • Place the hose in the deep end with a clean cloth to avoid surface damage.
  • Start filtrationimmediatelyoncefull for72

 

Visit1:Day1(InitialBalancingand Setup)

 

TPRGTechnicianperformsinitial testsandmajoradjustmentstokickoff curing.

 

Step

Action

Details

1

Testwater

MeasurepH,TA,CH.IfTA >100ppm,lowerfirst.

 

2

 

AdjustTA

 

Ifhigh(>100ppm),addpre-dilutedmuriaticacidtoreach80-100ppm. Broadcast slowly; retest after 1-2 hours.

3

AdjustpH

OnceTA is inrange,usemuriaticacidtolowerpHto7.2-7.6ifneeded.

 

Step

Action

Details

 

 

4

 

 

AdjustCH

If low (<80 ppm), add calcium chloride (dissolved in water) in 10 lb increments,spacedhoursapart,toreach80-100ppm.Donotmixwith baking soda.

 

5

Addsequestering agent

AddJack'sMagicTheMagentaStuff(1quart/15,000gallons)to prevent stains from metals in fill water. Broadcast evenly; run circulation for 48+ hours.

6

Brushing&Filtration

Brushentiresurface.Runpumpscontinuously48 hours.

 

7

 

Homeowner Instructions

 

Testdaily;recommended brush1/day;nochlorineyet(wait48hours).

 

Visit2:Day3(Mid-Week Check and Chlorination)

 

Technicianverifiesprogress,introducessanitizer,andfine-tunesfor stability.

 

Step

Action

Details

1

Testwater

RecheckpH,TA,CH.Adjustasneededusingmuriaticacidfor pH/TA.

2

IncreaseCH

Raiseto100-150ppmwithcalciumchlorideifstable.

3

Addchlorine

Addpre-dilutedliquidchlorinetoreach1.5-3.0ppm.Avoid tablets/shock for now.

4

Re-dosesequestrantif needed

Iftestsshowmetals,addmaintenancedoseofTheMagenta Stuff per label.

5

Brushing&Filtration

Brushwallsandfloor,continuousrun48 hours

 

Visit3:Day7-8(FinalEarly-Stage Balancing)

 

Technicianensureswaterisclear,dust-free,andbalancedbeforetransitioningtomaintenance. This wraps the intensive 7-8 day phase.

 

Step

Action

Details

1

Testwater

Fullcheck:pH,TA,CH,chlorine.AdjustwithmuriaticacidforpH/TA.

 

Step

Action

Details

2

Final CH adjustment

Increaseto200ppmminimumifnotalready.

3

Addstabilizer (CYA)

Ifnotstarted,addto 30-50ppmthroughskimmer;brushafter.

4

Verify sequestrant

ConfirmTheMagentaStuffeffectiveness;addifstaining appears.

5

Brushing&Filtration

Reducetonormal cycle ifwater isclear

 

6

Homeowner Instructions

Weekly tests/adjustments ongoing. No heater/salt for 30 days. Brush 1/ daywallsandfloors.RetestwithmuriaticacidasneededtomaintainpH. Schedule follow-up if issues arise.

 

Post-7-8Days (OngoingtoDay 28)

 

  • Continueweeklychemicaltests/adjustments.
  • Brushweeklywallsand
  • MaintainLSI(LangelierSaturationIndex)between-0.3and+0.3toavoidetchingor scaling (calculate using pH, TA, CH, temperature).
  • Novacuumswithwheelsorautomaticcleanersuntil Day
  • Ifissueslikemottlingorscalingoccur,giveusacalltofixit407-898-

Leave this empty:

Signature arrow sign here


Signature Certificate
Document name: Pool Startup Process After Plaster Resurfacing
lock iconUnique Document ID: 1e4eb26ac3f33336256620fac96a774a11766b93
Timestamp Audit
January 22, 2026 11:59 am GMTPool Startup Process After Plaster Resurfacing Uploaded by Pool Repair Guy - malik.shahan7890@gmail.com IP 39.60.226.150